ROSMA-INN-BPH-DWG-00095
Rev 05As-Built123A90-DDL-PR-DG-80000 - Base Load Power Hub (BLPH) - Process Safety Cause & Effect Block Diagram
Metadata
- Document number
- ROSMA-INN-BPH-DWG-00095
- Title
- 123A90-DDL-PR-DG-80000 - Base Load Power Hub (BLPH) - Process Safety Cause & Effect Block Diagram
- Revision
- 05
- Status
- As-Built
- Type
- Drawing
- Discipline
- Innovations package mgt
- Project phase
- As Built
- Date modified
- 2026-01-19
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Documentation
- Oracle Tracking ID
- 1348828088488635990
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-00370
- Alternative reference
- 123A90-DDL-PR-DG-80000
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 4 current | 05 | 2026-01-19 | 123A90-DDL-PR-DG-80000 REV.05-1348828089150735967df.pdf PDF · 86.8 KB 123A90-DDL-PR-DG-80000 REV.05-1348828089122480529df.pdf PDF · 86.8 KB · copy | 1 pages, 3 passages |
| Version 3 | 04 | 2025-10-27 | 123A90-DDL-PR-DG-80000 Rev.04-1348828089116692457df.pdf PDF · 214.9 KB | 1 pages, 3 passages |
| Version 2 | 03 | 2025-06-19 | 123A90-DDL-PR-DG-80000 Rev.03-1348828089085259973df.pdf PDF · 190.7 KB | 1 pages, 3 passages |
| Version 1 | 02 | 2025-04-22 | 123A90-DDL-PR-DG-80000 REV.02-1348828089070524243df.pdf PDF · 193.0 KB | 1 pages, 3 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2026-01-19 | 05 | As-Built | Version 4 | current |
| 2025-11-14 | 05 | Issued As-Built | Version 4 | |
| 2025-10-27 | 04 | Code 2 - comments | Version 3 | |
| 2025-06-19 | 03 | Issued for Construction | Version 2 | |
| 2025-04-22 | 02 | Issued for Construction | Version 1 |