ROSMA-INN-BPH-DWG-00197
Rev 05As-Built1724000372-EL-DG-00008 - DC UPS - WIRING DIAGRAM AND TERMINAL SCHEDULE INCLUDING EQUIPMENTS LIST AND BILL OF MATERIAL (3W POWER)
Metadata
- Document number
- ROSMA-INN-BPH-DWG-00197
- Title
- 1724000372-EL-DG-00008 - DC UPS - WIRING DIAGRAM AND TERMINAL SCHEDULE INCLUDING EQUIPMENTS LIST AND BILL OF MATERIAL (3W POWER)
- Revision
- 05
- Status
- As-Built
- Type
- Drawing
- Discipline
- Innovations package mgt
- Project phase
- Construction
- Date modified
- 2025-04-22
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Documentation
- Oracle Tracking ID
- 1348828088491117033
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Alternative reference
- 1724000372-EL-DG-00008
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 1 current | 05 | 2025-04-22 | 1724000372-EL-DG-00008_REV.05-1348828089070524597df.pdf PDF · 3.5 MB | 53 pages, 68 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2025-04-22 | 05 | As-Built | Version 1 | current |