ROSMA-INN-BPH-PRD-00049
Rev 01Approved for Construction123A90-PML-WEL-PRO-05008 - Heat Straightening Procedure
Metadata
- Document number
- ROSMA-INN-BPH-PRD-00049
- Title
- 123A90-PML-WEL-PRO-05008 - Heat Straightening Procedure
- Revision
- 01
- Status
- Approved for Construction
- Type
- Procedure
- Discipline
- Innovations package mgt
- Project phase
- Construction
- Date modified
- 2025-04-22
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Documentation
- Oracle Tracking ID
- 1348828088490937538
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-00681
- Alternative reference
- 123A90-PML-WEL-PRO-05008
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 1 current | 01 | 2025-04-22 | 123A90-PML-WEL-PRO-05008 Rev.01-1348828089070484247df.pdf PDF · 4.7 MB | 38 pages, 22 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2025-04-22 | 01 | Approved for Construction | Version 1 | current |