ROSMA-INN-BPH-DWG-00185
Rev 02As-Built123A90-DDL-EL-DL-20101 - BASE LOAD POWER HUB (BLPH) - ELECTRICAL EQUIPMENT LAYOUT - LOWER DECK
Metadata
- Document number
- ROSMA-INN-BPH-DWG-00185
- Title
- 123A90-DDL-EL-DL-20101 - BASE LOAD POWER HUB (BLPH) - ELECTRICAL EQUIPMENT LAYOUT - LOWER DECK
- Revision
- 02
- Status
- As-Built
- Type
- Drawing
- Discipline
- Innovations package mgt
- Project phase
- As Built
- Date modified
- 2025-10-27
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Design
- Oracle Tracking ID
- 1348828088490649718
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-00605
- Alternative reference
- 123A90-DDL-EL-DL-20101
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 2 current | 02 | 2025-10-27 | 123A90-DDL-EL-DL-20101 Rev.02-1348828089116692215df.pdf PDF · 359.4 KB | 1 pages, 1 passages |
| Version 1 | 01 | 2025-04-22 | 123A90-DDL-EL-DL-20101 Rev 01-1348828089070491424df.pdf PDF · 477.4 KB | 1 pages, 1 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2025-10-27 | 02 | As-Built | Version 2 | current |
| 2025-04-22 | 01 | Approved for Construction | Version 1 |