ROSMA-INN-BPH-RPT-00009
Rev 03Approved for Construction123A90-DDL-MAT-RE-60011 - Materials selection report
Metadata
- Document number
- ROSMA-INN-BPH-RPT-00009
- Title
- 123A90-DDL-MAT-RE-60011 - Materials selection report
- Revision
- 03
- Status
- Approved for Construction
- Type
- Report
- Discipline
- Innovations package mgt
- Project phase
- Design
- Date modified
- 2026-01-19
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Documentation
- Oracle Tracking ID
- 1348828088487724826
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-00154
- Alternative reference
- 123A90-DDL-MAT-RE-60011
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 2 current | 03 | 2026-01-19 | 123A90-DDL-MAT-RE-60011 Rev.03-1348828089150735923df.pdf PDF · 3.3 MB | 45 pages, 71 passages |
| Version 1 | 02 | 2025-04-22 | 123A90-DDL-MAT-RE-60011 Rev.02-1348828089070491604df.pdf PDF · 2.5 MB | 45 pages, 73 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2026-01-19 | 03 | Approved for Construction | Version 2 | current |
| 2025-04-22 | 02 | Code 2 - comments | Version 1 |