ROSMA-INN-BPH-RPT-00055
Rev 02Approved for Construction123A90-DDL-ST-RE-90009 - BLPH Platform Transition Piece Transportation Analysis
Zip archive: its contents are not searchable yet; found by its metadata only.
Metadata
- Document number
- ROSMA-INN-BPH-RPT-00055
- Title
- 123A90-DDL-ST-RE-90009 - BLPH Platform Transition Piece Transportation Analysis
- Revision
- 02
- Status
- Approved for Construction
- Type
- Report
- Discipline
- Innovations package mgt
- Project phase
- Design
- Date modified
- 2025-04-22
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Design
- Oracle Tracking ID
- 1348828088490448808
- Created by
- ROSETTI
- Review status
- None
- File type
- zip
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-00558
- Alternative reference
- 123A90-DDL-ST-RE-90009
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 1 current | 02 | 2025-04-22 | 123A90-DDL-ST-RE-90009_Rev.02-1348828089070524177df.zip ZIP · 9.4 MB | Zip archive: its contents are not searchable yet; found by its metadata only. |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2025-04-22 | 02 | Approved for Construction | Version 1 | current |