ROSMA-INN-BPH-PRD-00048
Rev 03Approved for Construction123A90-DDL-IN-PRO-40010 - Override Procedures for Process Safeguarding Systems
Metadata
- Document number
- ROSMA-INN-BPH-PRD-00048
- Title
- 123A90-DDL-IN-PRO-40010 - Override Procedures for Process Safeguarding Systems
- Revision
- 03
- Status
- Approved for Construction
- Type
- Procedure
- Discipline
- Innovations package mgt
- Project phase
- Design
- Date modified
- 2026-01-19
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Design
- Oracle Tracking ID
- 1348828088490434860
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-00611
- Alternative reference
- 123A90-DDL-IN-PRO-40010
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 3 current | 03 | 2026-01-19 | 123A90-DDL-IN-PRO-40010 Rev.03-1348828089150735976df.pdf PDF · 539.6 KB | 22 pages, 26 passages |
| Version 2 | 02 | 2025-11-14 | 123A90-DDL-IN-PRO-40010 Rev.02-1348828089122480504df.pdf PDF · 356.0 KB | 16 pages, 21 passages |
| Version 1 | 01 | 2025-04-22 | 123A90-DDL-IN-PRO-40010 Rev.01-1348828089070492004df.pdf PDF · 981.6 KB | 16 pages, 22 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2026-01-19 | 03 | Approved for Construction | Version 3 | current |
| 2025-11-14 | 02 | Issued for Construction | Version 2 | |
| 2025-04-22 | 01 | Code 2 - comments | Version 1 |