ROSMA-INN-BPH-SD-00292
Rev 00Approved for Construction123A90-FDL-ST-DD-90287 -TOPSIDES - COLUMNS AND BRACINGS ROW 3 - ASSEMBLY ROW 3
Metadata
- Document number
- ROSMA-INN-BPH-SD-00292
- Title
- 123A90-FDL-ST-DD-90287 -TOPSIDES - COLUMNS AND BRACINGS ROW 3 - ASSEMBLY ROW 3
- Revision
- 00
- Status
- Approved for Construction
- Type
- Shop Drawing
- Discipline
- Innovations package mgt
- Project phase
- Construction
- Date modified
- 2025-04-22
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Documentation
- Oracle Tracking ID
- 1348828088490257609
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Alternative reference
- 123A90-FDL-ST-DD-90287
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 1 current | 00 | 2025-04-22 | 123A90-FDL-ST-DD-90287_0-1348828089070484222df.PDF PDF · 188.5 KB | 1 pages, 1 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2025-04-22 | 00 | Approved for Construction | Version 1 | current |