ROSMA-INN-BPH-RPT-00052
Rev 04Approved for Construction123A90-DDL-SAF-RE-30020 - Fire and Explosion Risk Analys (FERA) report
Metadata
- Document number
- ROSMA-INN-BPH-RPT-00052
- Title
- 123A90-DDL-SAF-RE-30020 - Fire and Explosion Risk Analys (FERA) report
- Revision
- 04
- Status
- Approved for Construction
- Type
- Report
- Discipline
- Innovations package mgt
- Project phase
- Design
- Date modified
- 2025-04-22
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Design
- Oracle Tracking ID
- 1348828088490237852
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-00585
- Alternative reference
- 123A90-DDL-SAF-RE-30020
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 1 current | 04 | 2025-04-22 | 123A90-DDL-SAF-RE-30020_Rev.04-1348828089070524284df.pdf PDF · 6.6 MB | 145 pages, 218 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2025-04-22 | 04 | Approved for Construction | Version 1 | current |