ROSMA-INN-BPH-DTS-00039
Rev 02Approved for Construction123A90-DDL-IN-DS-40057 - TECHNICAL DATASHEET for Fire & Gas Field Equipment
Metadata
- Document number
- ROSMA-INN-BPH-DTS-00039
- Title
- 123A90-DDL-IN-DS-40057 - TECHNICAL DATASHEET for Fire & Gas Field Equipment
- Revision
- 02
- Status
- Approved for Construction
- Type
- Data Sheet
- Discipline
- Innovations package mgt
- Project phase
- Design
- Date modified
- 2025-10-27
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Design
- Oracle Tracking ID
- 1348828088490118099
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-00551
- Alternative reference
- 123A90-DDL-IN-DS-40057
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 2 current | 02 | 2025-10-27 | 123A90-DDL-IN-DS-40057 Rev.02-1348828089116692509df.pdf PDF · 663.6 KB | 22 pages, 38 passages |
| Version 1 | 01 | 2025-04-22 | 123A90-DDL-IN-DS-40057 Rev.01-1348828089070491985df.pdf PDF · 1.5 MB | 22 pages, 38 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2025-10-27 | 02 | Approved for Construction | Version 2 | current |
| 2025-04-22 | 01 | Code 2 - comments | Version 1 |