ROSMA-INN-BPH-DWG-00009
Rev 03Approved for Construction123A90-DDL-PR-UFD-80007 - BLPH UTILITY FLOW DIAGRAM INSTRUMENT AIR AND NITROGEN SYSTEMS
Metadata
- Document number
- ROSMA-INN-BPH-DWG-00009
- Title
- 123A90-DDL-PR-UFD-80007 - BLPH UTILITY FLOW DIAGRAM INSTRUMENT AIR AND NITROGEN SYSTEMS
- Revision
- 03
- Status
- Approved for Construction
- Type
- Drawing
- Discipline
- Innovations package mgt
- Project phase
- Design
- Date modified
- 2025-06-19
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Documentation
- Oracle Tracking ID
- 1348828088487602577
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-00143
- Alternative reference
- 123A90-DDL-PR-UFD-80007
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 1 current | 03 | 2025-06-19 | 123A90-DDL-PR-UFD-80007 REV.03-1348828089085260126df.pdf PDF · 405.3 KB 123A90-DDL-PR-UFD-80007 REV.03-1348828089070524585df.pdf PDF · 405.3 KB · copy | 1 pages, 1 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2025-06-19 | 03 | Approved for Construction | Version 1 | current |
| 2025-04-22 | 03 | Issued for Construction | Version 1 |