ROSMA-INN-BPH-DWG-00007
Rev 03Final123A90-DDL-PR-DG-80005 - BLPH PROCESS FLOW SCHEME FUEL CELL PACKAGE
Metadata
- Document number
- ROSMA-INN-BPH-DWG-00007
- Title
- 123A90-DDL-PR-DG-80005 - BLPH PROCESS FLOW SCHEME FUEL CELL PACKAGE
- Revision
- 03
- Status
- Final
- Type
- Drawing
- Discipline
- Innovations package mgt
- Project phase
- As Built
- Date modified
- 2026-05-20
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Documentation
- Oracle Tracking ID
- 1348828088487601636
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-00141
- Alternative reference
- 123A90-DDL-PR-DG-80005
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 2 current | 03 | 2026-05-20 | 123A90-DDL-PR-DG-80005 REV.03-1348828089205692232df.pdf PDF · 243.5 KB 123A90-DDL-PR-DG-80005 REV.03-1348828089116692233df.pdf PDF · 243.5 KB · copy 123A90-DDL-PR-DG-80005 REV.03-1348828089122480452df.pdf PDF · 243.5 KB · copy | 1 pages, 1 passages |
| Version 1 | 02 | 2025-04-22 | 123A90-DDL-PR-DG-80005 Rev.02-1348828089070491477df.pdf PDF · 395.2 KB | 1 pages, 1 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2026-05-20 | 03 | Final | Version 2 | current |
| 2025-11-14 | 03 | Code 2 - comments | Version 2 | |
| 2025-10-27 | 03 | Issued As-Built | Version 2 | |
| 2025-04-22 | 02 | Approved for Construction | Version 1 |