ROSMA-INN-BPH-REG-00011
Rev 04As-Built123A90-DDL-EL-LIS-20147 - Electrical Load List and Balance (CCS MODE 5 -POWER OUT (Blackout)-
Metadata
- Document number
- ROSMA-INN-BPH-REG-00011
- Title
- 123A90-DDL-EL-LIS-20147 - Electrical Load List and Balance (CCS MODE 5 -POWER OUT (Blackout)-
- Revision
- 04
- Status
- As-Built
- Type
- Register
- Discipline
- Innovations package mgt
- Project phase
- As Built
- Date modified
- 2025-11-14
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Documentation
- Oracle Tracking ID
- 1348828088489690159
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-00522.
- Alternative reference
- 123A90-DDL-EL-LIS-20147
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 2 current | 04 | 2025-11-14 | 123A90-DDL-EL-LIS-20147 REV.04-1348828089122480451df.pdf PDF · 1.6 MB 123A90-DDL-EL-LIS-20147 REV.04-1348828089116692189df.pdf PDF · 1.6 MB · copy | 14 pages, 39 passages |
| Version 1 | 03 | 2025-04-22 | 123A90-DDL-EL-LIS-20147 Rev.03-1348828089070491638df.pdf PDF · 927.5 KB | 14 pages, 39 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2025-11-14 | 04 | As-Built | Version 2 | current |
| 2025-10-27 | 04 | Issued As-Built | Version 2 | |
| 2025-04-22 | 03 | Approved for Construction | Version 1 |