ROSMA-INN-BPH-PRD-00035
Rev 02Approved for Construction123A90-PML-DIG-PRO-00002 - Equipment and System Tag Numbering
Metadata
- Document number
- ROSMA-INN-BPH-PRD-00035
- Title
- 123A90-PML-DIG-PRO-00002 - Equipment and System Tag Numbering
- Revision
- 02
- Status
- Approved for Construction
- Type
- Procedure
- Discipline
- Innovations package mgt
- Project phase
- Design
- Date modified
- 2026-01-19
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Documentation
- Oracle Tracking ID
- 1348828088489377731
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-00443
- Alternative reference
- 123A90-PML-DIG-PRO-00002
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 2 current | 02 | 2026-01-19 | 123A90-PML-DIG-PRO-00002 Rev.02-1348828089150736011df.pdf PDF · 1.2 MB 123A90-PML-DIG-PRO-00002 Rev.02-1348828089122480438df.pdf PDF · 1.2 MB · copy | 40 pages, 50 passages |
| Version 1 | 01 | 2025-04-22 | 123A90-PML-DIG-PRO-00002 Rev. 01-1348828089070484694df.pdf PDF · 1.1 MB | 40 pages, 50 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2026-01-19 | 02 | Approved for Construction | Version 2 | current |
| 2025-11-14 | 02 | Issued for Construction | Version 2 | |
| 2025-04-22 | 01 | Code 2 - comments | Version 1 |