ROSMA-INN-BPH-RPT-00031
Rev 04Approved for Construction123A90-DDL-PR-RE-80031 - Process Control, Operation, Start-up and Shutdown Philosophy
Metadata
- Document number
- ROSMA-INN-BPH-RPT-00031
- Title
- 123A90-DDL-PR-RE-80031 - Process Control, Operation, Start-up and Shutdown Philosophy
- Revision
- 04
- Status
- Approved for Construction
- Type
- Report
- Discipline
- Innovations package mgt
- Project phase
- Design
- Date modified
- 2026-01-19
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Documentation
- Oracle Tracking ID
- 1348828088489204620
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-00466
- Alternative reference
- 123A90-DDL-PR-RE-80031
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 3 current | 04 | 2026-01-19 | 123A90-DDL-PR-RE-80031 REV.04-1348828089150735900df.pdf PDF · 748.0 KB | 29 pages, 49 passages |
| Version 2 | 03 | 2025-06-19 | 123A90-DDL-PR-RE-80031 Rev.03-1348828089085260022df.pdf PDF · 413.5 KB | 29 pages, 47 passages |
| Version 1 | 02 | 2025-04-22 | 123A90-DDL-PR-RE-80031 Rev.02-1348828089070491720df.pdf PDF · 543.2 KB | 34 pages, 54 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2026-01-19 | 04 | Approved for Construction | Version 3 | current |
| 2025-06-19 | 03 | Code 2 - comments | Version 2 | |
| 2025-04-22 | 02 | Code 2 - comments | Version 1 |