ROSMA-INN-BPH-REG-00007
Rev 07As-Built123A90-DDL-IN-CE-40000 - Process Safety Cause and Effect Matrix
Metadata
- Document number
- ROSMA-INN-BPH-REG-00007
- Title
- 123A90-DDL-IN-CE-40000 - Process Safety Cause and Effect Matrix
- Revision
- 07
- Status
- As-Built
- Type
- Register
- Discipline
- Innovations package mgt
- Project phase
- Design
- Date modified
- 2026-01-19
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Documentation
- Oracle Tracking ID
- 1348828088488878536
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-00421
- Alternative reference
- 123A90-DDL-IN-CE-40000
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 3 current | 07 | 2026-01-19 | 123A90-DDL-IN-CE-40000 REV 07-1348828089150735946df.pdf PDF · 426.3 KB | 9 pages, 20 passages |
| Version 2 | 06 | 2025-11-14 | 123A90-DDL-IN-CE-40000 Rev.06-1348828089122480477df.pdf PDF · 373.8 KB 123A90-DDL-IN-CE-40000 Rev.06-1348828089116692411df.pdf PDF · 373.8 KB · copy | 9 pages, 20 passages |
| Version 1 | 04 | 2025-04-22 | 123A90-DDL-IN-CE-40000_Rev.04-1348828089070524406df.zip ZIP · 831.7 KB | Zip archive: its contents are not searchable yet; found by its metadata only. |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2026-01-19 | 07 | As-Built | Version 3 | current |
| 2025-11-14 | 06 | Approved for Construction | Version 2 | |
| 2025-10-27 | 06 | Issued for Construction | Version 2 | |
| 2025-04-22 | 04 | Code 2 - comments | Version 1 |