ROSMA-INN-BPH-ITR-00133
Rev 05For InformationCOMM DOSSIER SUB-SYSTEM 80-00
Metadata
- Document number
- ROSMA-INN-BPH-ITR-00133
- Title
- COMM DOSSIER SUB-SYSTEM 80-00
- Revision
- 05
- Status
- For Information
- Type
- Inspection and Test Record
- Discipline
- Innovations package mgt
- Project phase
- Commissioning
- Date modified
- 2026-03-09
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Certification
- Oracle Tracking ID
- 1348828088502817504
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 1 current | 05 | 2026-03-09 | Dossier_COMM_80-00_rev05-1348828089169194939df.pdf PDF · 237.4 MB | 2141 pages, 3,105 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2026-03-09 | 05 | For Information | Version 1 | current |