ROSMA-INN-BPH-SPC-00030
Rev 02Approved for Construction123A90-DDL-IN-SP-40097 - System Specification for Main Automation Contractor
Metadata
- Document number
- ROSMA-INN-BPH-SPC-00030
- Title
- 123A90-DDL-IN-SP-40097 - System Specification for Main Automation Contractor
- Revision
- 02
- Status
- Approved for Construction
- Type
- Specification
- Discipline
- Innovations package mgt
- Project phase
- Design
- Date modified
- 2026-01-19
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Documentation
- Oracle Tracking ID
- 1348828088488793715
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-00386
- Alternative reference
- 123A90-DDL-IN-SP-40097
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 3 current | 02 | 2026-01-19 | 123A90-DDL-IN-SP-40097_Rev02-1348828089150735918df.pdf PDF · 981.5 KB 123A90-DDL-IN-SP-40097_Rev02-1348828089122444231df.pdf PDF · 981.5 KB · copy | 46 pages, 87 passages |
| Version 2 | 01 | 2025-10-27 | 123A90-DDL-IN-SP-40097 Rev.01-1348828089116692240df.pdf PDF · 996.9 KB | 46 pages, 89 passages |
| Version 1 | 00 | 2025-04-22 | 123A90-DDL-IN-SP-40097 Rev.00-1348828089070483872df.pdf PDF · 999.2 KB | 46 pages, 86 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2026-01-19 | 02 | Approved for Construction | Version 3 | current |
| 2025-11-14 | 02 | Issued for Construction | Version 3 | |
| 2025-10-27 | 01 | Code 2 - comments | Version 2 | |
| 2025-04-22 | 00 | Code 2 - comments | Version 1 |