ROSMA-INN-BPH-ITR-00040
Rev 06For InformationCOMMISSIONING DOSSIER SUB-SYSTEM 50-10
Metadata
- Document number
- ROSMA-INN-BPH-ITR-00040
- Title
- COMMISSIONING DOSSIER SUB-SYSTEM 50-10
- Revision
- 06
- Status
- For Information
- Type
- Inspection and Test Record
- Discipline
- Innovations package mgt
- Project phase
- Commissioning
- Date modified
- 2026-03-09
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Certification
- Oracle Tracking ID
- 1348828088502766052
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 1 current | 06 | 2026-03-09 | Dossier_COMM_50-10_rev06-1348828089169194914df.pdf PDF · 104.6 MB | 456 pages, 567 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2026-03-09 | 06 | For Information | Version 1 | current |