ROSMA-INN-BPH-ITR-00028
Rev 03For InformationCOMMISSIONING DOSSIER SUB-SYSTEM 25-06
Metadata
- Document number
- ROSMA-INN-BPH-ITR-00028
- Title
- COMMISSIONING DOSSIER SUB-SYSTEM 25-06
- Revision
- 03
- Status
- For Information
- Type
- Inspection and Test Record
- Discipline
- Innovations package mgt
- Project phase
- Commissioning
- Date modified
- 2026-02-17
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Certification
- Oracle Tracking ID
- 1348828088502745506
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 1 current | 03 | 2026-02-17 | Dossier_COMM_25-06_REV.003-1348828089160818797df.pdf PDF · 45.5 MB | 238 pages, 294 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2026-02-17 | 03 | For Information | Version 1 | current |