ROSMA-INN-BPH-ITR-00022
Rev 02For InformationMECHANICAL COMPLETION SUB-SYSTEM 25-05
Metadata
- Document number
- ROSMA-INN-BPH-ITR-00022
- Title
- MECHANICAL COMPLETION SUB-SYSTEM 25-05
- Revision
- 02
- Status
- For Information
- Type
- Inspection and Test Record
- Discipline
- Innovations package mgt
- Project phase
- Construction
- Date modified
- 2026-02-13
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Certification
- Oracle Tracking ID
- 1348828088502712684
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 1 current | 02 | 2026-02-13 | Dossier_MC_25-05_REV02-1348828089160100118df.pdf PDF · 234.7 MB | 999 pages, 2,127 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2026-02-13 | 02 | For Information | Version 1 | current |