ROSMA-INN-BPH-ITR-00007
Rev 00For InformationMECHANICAL COMPLETION DOSSIER-SUB SYSTEM 77-30
Metadata
- Document number
- ROSMA-INN-BPH-ITR-00007
- Title
- MECHANICAL COMPLETION DOSSIER-SUB SYSTEM 77-30
- Revision
- 00
- Status
- For Information
- Type
- Inspection and Test Record
- Discipline
- Innovations package mgt
- Project phase
- Construction
- Date modified
- 2026-02-13
- Date created
- 2026-02-13
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Certification
- Oracle Tracking ID
- 1348828088502707246
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 1 current | 00 | 2026-02-13 | Dossier_MC_77-30_REV.02-1348828089160148758df.pdf PDF · 124.4 MB | 535 pages, 724 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2026-02-13 | 00 | For Information | Version 1 | current |