ROSMA-INN-BPH-CER-00041
Rev 01Approved for Construction1724001660-QC-DB-00005-MANUFACTURERS RECORD BOOK (FINAL DOSSIER)-FIREFIGHTING AND SAFETY EQUIPMENT (DRAEGER)
Metadata
- Document number
- ROSMA-INN-BPH-CER-00041
- Title
- 1724001660-QC-DB-00005-MANUFACTURERS RECORD BOOK (FINAL DOSSIER)-FIREFIGHTING AND SAFETY EQUIPMENT (DRAEGER)
- Revision
- 01
- Status
- Approved for Construction
- Type
- Certificate
- Discipline
- Innovations package mgt
- Project phase
- Commissioning
- Date modified
- 2026-05-20
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Documentation
- Oracle Tracking ID
- 1348828088501329462
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-01612
- Alternative reference
- 1724001660-QC-DB-00005
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 2 current | 01 | 2026-05-20 | 1724001660-QC-DB-00005 REV01-1348828089205692237df.pdf PDF · 105.1 MB 1724001660-QC-DB-00005 REV01-1348828089169194917df.pdf PDF · 105.1 MB · copy | 661 pages, 909 passages |
| Version 1 | 00 | 2026-01-19 | 1724001660-QC-DB-00005 Rev.00-1348828089150735898df.pdf PDF · 104.6 MB 1724001660-QC-DB-00005 Rev.00-1348828089122480424df.pdf PDF · 104.6 MB · copy | 656 pages, 898 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2026-05-20 | 01 | Approved for Construction | Version 2 | current |
| 2026-03-09 | 01 | Issued for Construction | Version 2 | |
| 2026-01-19 | 00 | Code 2 - comments | Version 1 | |
| 2025-11-14 | 00 | For Review | Version 1 |