ROSMA-INN-BPH-CER-00040
Rev 02Approved for Construction1724000204-QC-DB-00011-SDV- BDV AND TIGHT SHUT-OFF XV VALVES - MANUFACTURERS RECORD BOOK (FINAL DOSSIER) (FLUITEK)
Metadata
- Document number
- ROSMA-INN-BPH-CER-00040
- Title
- 1724000204-QC-DB-00011-SDV- BDV AND TIGHT SHUT-OFF XV VALVES - MANUFACTURERS RECORD BOOK (FINAL DOSSIER) (FLUITEK)
- Revision
- 02
- Status
- Approved for Construction
- Type
- Certificate
- Discipline
- Innovations package mgt
- Project phase
- As Built
- Date modified
- 2026-03-09
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Documentation
- Oracle Tracking ID
- 1348828088501066077
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-01605
- Alternative reference
- 1724000204-QC-DB-00011
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 3 current | 02 | 2026-03-09 | 1724000204-QC-DB-00011 Rev.02-1348828089169194928df.pdf PDF · 561.0 MB | 1294 pages, 2,530 passages |
| Version 2 | 01 | 2026-01-19 | 1724000204-QC-DB-00011 Rev.01-1348828089150735899df.pdf PDF · 550.8 MB | 1122 pages, 2,109 passages |
| Version 1 | 00 | 2025-11-14 | 1724000204-QC-DB-00011 Rev.00-1348828089122444211df.pdf PDF · 525.8 MB 1724000204-QC-DB-00011 Rev.00-1348828089116692275df.pdf PDF · 525.8 MB · copy | 1015 pages, 1,957 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2026-03-09 | 02 | Approved for Construction | Version 3 | current |
| 2026-01-19 | 01 | Code 2 - comments | Version 2 | |
| 2025-11-14 | 00 | Code 3 - fail | Version 1 | |
| 2025-10-27 | 00 | For Review | Version 1 |