BPSE-BMG-BPH-CKT-00007
Rev 002As-BuiltBLPH Project - Preservation and ready for Sail Away
Metadata
- Document number
- BPSE-BMG-BPH-CKT-00007
- Title
- BLPH Project - Preservation and ready for Sail Away
- Revision
- 002
- Status
- As-Built
- Type
- Checklist
- Discipline
- BoP package mgt
- Project phase
- As Built
- Date modified
- 2026-01-19
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Fuel Cells
- Keywords
- Documentation
- Oracle Tracking ID
- 1348828088500671651
- Created by
- Ballard Power Systems Europe
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-BMG-BPH-CRS-00020
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 1 current | 002 | 2026-01-19 | K559-2254-CWIWP4202202-R04-001Rev002-1348828089150734688df.pdf PDF · 1.7 MB K559-2254-CWIWP4202202-R04-001Rev002-1348828089116571555df.pdf PDF · 1.7 MB · copy | 11 pages, 11 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2026-01-19 | 002 | As-Built | Version 1 | current |
| 2025-10-26 | 002 | As-Built | Version 1 |