ROSMA-INN-BPH-MAN-00043
Rev 02Approved for Construction123A90-DDL-TI-RE-99008-CF - LOAD OUT MANUAL
Metadata
- Document number
- ROSMA-INN-BPH-MAN-00043
- Title
- 123A90-DDL-TI-RE-99008-CF - LOAD OUT MANUAL
- Revision
- 02
- Status
- Approved for Construction
- Type
- Manual
- Discipline
- Innovations package mgt
- Project phase
- Construction
- Date modified
- 2026-01-19
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Documentation
- Oracle Tracking ID
- 1348828088498572690
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-01581
- Alternative reference
- 123A90-DDL-TI-RE-99008
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 2 current | 02 | 2026-01-19 | 123A90-DDL-TI-RE-99008 Rev.02-1348828089150735966df.pdf PDF · 2.2 MB 123A90-DDL-TI-RE-99008 Rev.02-1348828089116692499df.pdf PDF · 2.2 MB · copy 123A90-DDL-TI-RE-99008 Rev.02-1348828089122480532df.pdf PDF · 2.2 MB · copy | 35 pages, 42 passages |
| Version 1 | 00 | 2025-06-19 | 123A90-DDL-TI-RE-99008 Rev.00-1348828089085260034df.pdf PDF · 763.2 KB | 25 pages, 30 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2026-01-19 | 02 | Approved for Construction | Version 2 | current |
| 2025-11-14 | 02 | Issued for Construction | Version 2 | |
| 2025-10-27 | 02 | Issued for Construction | Version 2 | |
| 2025-06-19 | 00 | For Approval | Version 1 |