ROSMA-INN-BPH-PRD-00199
Rev 03Final123A90-PML-QHSE-PRO-00126-Preservation Procedure
Metadata
- Document number
- ROSMA-INN-BPH-PRD-00199
- Title
- 123A90-PML-QHSE-PRO-00126-Preservation Procedure
- Revision
- 03
- Status
- Final
- Type
- Procedure
- Discipline
- Innovations package mgt
- Project phase
- Construction
- Date modified
- 2026-05-20
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Documentation
- Oracle Tracking ID
- 1348828088498384005
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-01576
- Alternative reference
- 123A90-PML-QHSE-PRO-00126
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 3 current | 03 | 2026-05-20 | 123A90-PML-QHSE-PRO-00126 Rev.03-1348828089205692245df.pdf PDF · 9.4 MB 123A90-PML-QHSE-PRO-00126 Rev.03-1348828089116692443df.pdf PDF · 9.4 MB · copy 123A90-PML-QHSE-PRO-00126 Rev.03-1348828089122444185df.pdf PDF · 9.4 MB · copy | 87 pages, 157 passages |
| Version 2 | 02 | 2025-07-31 | 123A90-PML-QHSE-PRO-00126 Rev.02-1348828089095751892df.pdf PDF · 4.1 MB 123A90-PML-QHSE-PRO-00126 Rev.02-1348828089094034772df.pdf PDF · 4.1 MB · copy | 52 pages, 58 passages |
| Version 1 | 01 | 2025-06-19 | 123A90-PML-QHSE-PRO-00126 Rev.01-1348828089085260123df.pdf PDF · 4.9 MB | 54 pages, 70 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2026-05-20 | 03 | Final | Version 3 | current |
| 2025-11-14 | 03 | Code 2 - comments | Version 3 | |
| 2025-10-27 | 03 | Issued for Construction | Version 3 | |
| 2025-07-31 | 02 | Issued for Construction | Version 2 | |
| 2025-07-24 | 02 | Issued for Construction | Version 2 | |
| 2025-06-19 | 01 | Issued for Construction | Version 1 |