ROSMA-INN-BPH-PRD-00197
Rev 01Approved for Construction1724000594-QC-PRO-00044 - CYBER SECURITY SAT PROCEDURE - INTEGRATED CONTROL AND SAFETY SYSTEM (ICSS) (YOKOGAWA)
Metadata
- Document number
- ROSMA-INN-BPH-PRD-00197
- Title
- 1724000594-QC-PRO-00044 - CYBER SECURITY SAT PROCEDURE - INTEGRATED CONTROL AND SAFETY SYSTEM (ICSS) (YOKOGAWA)
- Revision
- 01
- Status
- Approved for Construction
- Type
- Procedure
- Discipline
- Innovations package mgt
- Project phase
- Construction
- Date modified
- 2025-10-27
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Documentation
- Oracle Tracking ID
- 1348828088498086039
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-01570
- Alternative reference
- 1724000594-QC-PRO-00044
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 2 current | 01 | 2025-10-27 | 1724000594-QC-PRO-00044 REV.01-1348828089116692537df.pdf PDF · 732.4 KB | 74 pages, 82 passages |
| Version 1 | 00 | 2025-06-19 | 1724000594-QC-PRO-00044 Rev.00-1348828089085259959df.pdf PDF · 739.6 KB | 74 pages, 82 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2025-10-27 | 01 | Approved for Construction | Version 2 | current |
| 2025-06-19 | 00 | Code 2 - comments | Version 1 |