Phynix Document archive

← Search

ROSMA-INN-BPH-RPT-00333
Rev 02Approved for Construction

123A90-DDL-TI-RE-99002-TOPSIDE - LOAD OUT MANUAL INCLUDING BALLAST SEQUENCE_Attachment

Download ZIP

Zip archive: its contents are not searchable yet; found by its metadata only.

Metadata

Document number
ROSMA-INN-BPH-RPT-00333
Title
123A90-DDL-TI-RE-99002-TOPSIDE - LOAD OUT MANUAL INCLUDING BALLAST SEQUENCE_Attachment
Revision
02
Status
Approved for Construction
Type
Report
Discipline
Innovations package mgt
Project phase
Design
Date modified
2025-10-27
WBS scope 1
Baseload Power Hub
WBS scope 2
Baseload power hub overall
Keywords
Documentation
Oracle Tracking ID
1348828088497079205
Created by
ROSETTI
Review status
None
File type
zip
Contract deliverable
✗
As-built required
✗
Confidential
✗
Scale
0:0
Relationship
CWHKN-INN-BPH-CRS-01556
Alternative reference
123A90-DDL-TI-RE-99002

Versions

VersionRevisionDateFilesText
Version 2 current022025-10-27123A90-DDL-TI-RE-99002 - Attachments-1348828089116692255df.zip ZIP · 112.3 MBZip archive: its contents are not searchable yet; found by its metadata only.
Version 1002025-06-19123A90-DDL-TI-RE-99002_Rev.00 Attachment-1348828089085260132df.zip ZIP · 4.2 MBZip archive: its contents are not searchable yet; found by its metadata only.

Status history (Oracle)

DateRevisionStatusFileNote
2025-10-2702Approved for ConstructionVersion 2current
2025-06-1900Code 2 - commentsVersion 1