ROSMA-INN-BPH-RPT-00332
Rev 02Approved for Construction123A90-DDL-TI-RE-99002 - TOPSIDE - LOAD OUT MANUAL INCLUDING BALLAST SEQUENCE
Metadata
- Document number
- ROSMA-INN-BPH-RPT-00332
- Title
- 123A90-DDL-TI-RE-99002 - TOPSIDE - LOAD OUT MANUAL INCLUDING BALLAST SEQUENCE
- Revision
- 02
- Status
- Approved for Construction
- Type
- Report
- Discipline
- Innovations package mgt
- Project phase
- Design
- Date modified
- 2025-10-27
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Documentation
- Oracle Tracking ID
- 1348828088497079184
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-01556
- Alternative reference
- 123A90-DDL-TI-RE-99002
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 2 current | 02 | 2025-10-27 | 123A90-DDL-TI-RE-99002 Rev.02-1348828089116692341df.pdf PDF · 66.7 MB | 626 pages, 893 passages |
| Version 1 | 00 | 2025-06-19 | 123A90-DDL-TI-RE-99002_Rev.00-1348828089085260136df.pdf PDF · 31.5 MB | 359 pages, 510 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2025-10-27 | 02 | Approved for Construction | Version 2 | current |
| 2025-06-19 | 00 | Code 2 - comments | Version 1 |