ROSMA-INN-BPH-RPT-00307
Rev 01Approved for Construction123A90-DDL-TI-RE-99007 - CAISSONS FRAME - GRILLAGE AND SEA FASTENING DESIGN REPORT
Metadata
- Document number
- ROSMA-INN-BPH-RPT-00307
- Title
- 123A90-DDL-TI-RE-99007 - CAISSONS FRAME - GRILLAGE AND SEA FASTENING DESIGN REPORT
- Revision
- 01
- Status
- Approved for Construction
- Type
- Report
- Discipline
- Innovations package mgt
- Project phase
- Design
- Date modified
- 2025-10-27
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Documentation
- Oracle Tracking ID
- 1348828088495987186
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-01484
- Alternative reference
- 123A90-DDL-TI-RE-99007
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 2 current | 01 | 2025-10-27 | 123A90-DDL-TI-RE-99007 Rev.01-1348828089116692367df.pdf PDF · 1.8 MB 123A90-DDL-TI-RE-99007 Rev.01-1348828089085259985df.pdf PDF · 1.8 MB · copy | 52 pages, 68 passages |
| Version 1 | 00 | 2025-04-22 | 123A90-DDL-TI-RE-99007_Rev.00-1348828089070524158df.zip ZIP · 3.1 MB | Zip archive: its contents are not searchable yet; found by its metadata only. |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2025-10-27 | 01 | Approved for Construction | Version 2 | current |
| 2025-06-19 | 01 | Issued for Construction | Version 2 | |
| 2025-04-22 | 00 | Code 1 - no comments | Version 1 |