BPSE-DEN-BPH-APS-00005
Rev 002Code 1 - no commentsConfirmation of Satisfactory SAT - Signature Page J99-003
Metadata
- Document number
- BPSE-DEN-BPH-APS-00005
- Title
- Confirmation of Satisfactory SAT - Signature Page J99-003
- Revision
- 002
- Status
- Code 1 - no comments
- Type
- Acceptance Sheet
- Discipline
- Design & Engineering
- Project phase
- Commissioning
- Date modified
- 2025-10-26
- Date created
- 2025-08-05
- Due date
- 2025-08-15
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Fuel Cells
- Keywords
- Inspection
- Oracle Tracking ID
- 1348828088495460558
- Created by
- Ballard Power Systems Europe
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 2 current | 002 | 2025-10-26 | K559-2254-CWIWP4202202-J99-003-Rev002-1348828089116571582df.pdf PDF · 273.7 KB | 2 pages, 2 passages |
| Version 1 | 001 | 2025-04-23 | K559-2254-CWIWP4202202-J99-003-Rev001-1348828089070924561df.pdf PDF · 201.3 KB | 2 pages, 2 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2025-10-26 | 002 | Code 1 - no comments | Version 2 | current |
| 2025-04-23 | 001 | For Review | Version 1 |