ROSMA-INN-BPH-OTH-00203
Rev 01Approved for Construction123A90-PML-COM-PRO-03062 - OTP – Hydrogen Fuel Cell Package
Zip archive: its contents are not searchable yet; found by its metadata only.
Metadata
- Document number
- ROSMA-INN-BPH-OTH-00203
- Title
- 123A90-PML-COM-PRO-03062 - OTP – Hydrogen Fuel Cell Package
- Revision
- 01
- Status
- Approved for Construction
- Type
- Other
- Discipline
- Innovations package mgt
- Project phase
- Design
- Date modified
- 2025-12-16
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Documentation
- Oracle Tracking ID
- 1348828088495423574
- Created by
- ROSETTI
- Review status
- None
- File type
- zip
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-01482
- Alternative reference
- 123A90-PML-COM-PRO-03062
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 1 current | 01 | 2025-12-16 | 123A90-PML-COM-PRO-03062_Rev.01-1348828089134441935df.zip ZIP · 4.9 MB 123A90-PML-COM-PRO-03062_Rev.01-1348828089079118209df.zip ZIP · 4.9 MB · copy | Zip archive: its contents are not searchable yet; found by its metadata only. |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2025-12-16 | 01 | Approved for Construction | Version 1 | current |
| 2025-05-27 | 01 | Code 2 - comments | Version 1 |