ROSMA-INN-BPH-RPT-00281
Rev 03Approved for Construction123A90-DDL-SAF-RE-30012 - ALARP Demonstration Report
Metadata
- Document number
- ROSMA-INN-BPH-RPT-00281
- Title
- 123A90-DDL-SAF-RE-30012 - ALARP Demonstration Report
- Revision
- 03
- Status
- Approved for Construction
- Type
- Report
- Discipline
- Innovations package mgt
- Project phase
- Design
- Date modified
- 2025-11-14
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Design
- Oracle Tracking ID
- 1348828088494860116
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-01454
- Alternative reference
- 123A90-DDL-SAF-RE-30012
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 2 current | 03 | 2025-11-14 | 123A90-DDL-SAF-RE-30012 Rev.03-1348828089122480454df.pdf PDF · 2.4 MB | 70 pages, 129 passages |
| Version 1 | 02 | 2025-06-19 | 123A90-DDL-SAF-RE-30012 REV.02-1348828089085259966df.pdf PDF · 1.7 MB 123A90-DDL-SAF-RE-30012 REV.02-1348828089070524155df.pdf PDF · 1.7 MB · copy | 46 pages, 71 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2025-11-14 | 03 | Approved for Construction | Version 2 | current |
| 2025-06-19 | 02 | Code 2 - comments | Version 1 | |
| 2025-04-22 | 02 | Issued for Construction | Version 1 |