ROSMA-INN-BPH-PRD-00173
Rev 01Approved for Construction

1724000372-QC-PRO-00018-DC UPS - SITE ACCEPTANCE TEST PROCEDURE - PRE-COMMISSIONING - COMMISSIONING PROCEDURES (3W POWER)

Open PDFDownload PDF

Metadata

Document number
ROSMA-INN-BPH-PRD-00173
Title
1724000372-QC-PRO-00018-DC UPS - SITE ACCEPTANCE TEST PROCEDURE - PRE-COMMISSIONING - COMMISSIONING PROCEDURES (3W POWER)
Revision
01
Status
Approved for Construction
Type
Procedure
Discipline
Innovations package mgt
Project phase
Design
Date modified
2025-04-22
WBS scope 1
Baseload Power Hub
WBS scope 2
Baseload power hub overall
Keywords
Documentation
Oracle Tracking ID
1348828088494105872
Created by
ROSETTI
Review status
None
File type
pdf
Contract deliverable
✗
As-built required
✗
Confidential
✗
Scale
0:0
Relationship
CWHKN-INN-BPH-CRS-01378
Alternative reference
1724000372-QC-PRO-00018

Versions

VersionRevisionDateFilesText
Version 1 current012025-04-221724000372-QC-PRO-00018 REV.01-1348828089070524342df.pdf PDF · 771.6 KB17 pages, 17 passages

Status history (Oracle)

DateRevisionStatusFileNote
2025-04-2201Approved for ConstructionVersion 1current