ROSMA-INN-BPH-DWG-00388
Rev 03As-Built123A90-DDL-PP-DA-70053 - Piping general arrangement above upper deck EL.33990 to El.+46900
Metadata
- Document number
- ROSMA-INN-BPH-DWG-00388
- Title
- 123A90-DDL-PP-DA-70053 - Piping general arrangement above upper deck EL.33990 to El.+46900
- Revision
- 03
- Status
- As-Built
- Type
- Drawing
- Discipline
- Innovations package mgt
- Project phase
- Design
- Date modified
- 2026-01-19
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Design
- Oracle Tracking ID
- 1348828088493984740
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-01271
- Alternative reference
- 123A90-DDL-PP-DA-70053
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 2 current | 03 | 2026-01-19 | 123A90-DDL-PP-DA-70053 Rev.03-1348828089150735954df.pdf PDF · 2.2 MB | 1 pages, 1 passages |
| Version 1 | 01 | 2025-04-22 | 123A90-DDL-PP-DA-70053_Rev.01-1348828089070492065df.pdf PDF · 2.1 MB | 1 pages, 4 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2026-01-19 | 03 | As-Built | Version 2 | current |
| 2025-04-22 | 01 | Code 2 - comments | Version 1 |