ROSMA-INN-BPH-OTH-00190
Rev 01Approved for Construction123A90-PML-COM-PRO-03043 - OTP - Instrument Air Package
Metadata
- Document number
- ROSMA-INN-BPH-OTH-00190
- Title
- 123A90-PML-COM-PRO-03043 - OTP - Instrument Air Package
- Revision
- 01
- Status
- Approved for Construction
- Type
- Other
- Discipline
- Innovations package mgt
- Project phase
- Design
- Date modified
- 2025-12-16
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Documentation
- Oracle Tracking ID
- 1348828088493946711
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-01301
- Alternative reference
- 123A90-PML-COM-PRO-03043
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 1 current | 01 | 2025-12-16 | 123A90-PML-COM-PRO-03043_Rev.01-1348828089134476789df.pdf PDF · 1.7 MB 123A90-PML-COM-PRO-03043_Rev.01-1348828089079118206df.pdf PDF · 1.7 MB · copy | 46 pages, 59 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2025-12-16 | 01 | Approved for Construction | Version 1 | current |
| 2025-05-27 | 01 | Code 2 - comments | Version 1 |