ROSMA-INN-BPH-REG-00029
Rev 04Approved for Construction123A90-DDL-SAF-LIS-30000 - Hazardous Material Register and Inventory
Metadata
- Document number
- ROSMA-INN-BPH-REG-00029
- Title
- 123A90-DDL-SAF-LIS-30000 - Hazardous Material Register and Inventory
- Revision
- 04
- Status
- Approved for Construction
- Type
- Register
- Discipline
- Innovations package mgt
- Project phase
- Design
- Date modified
- 2025-10-27
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Documentation
- Oracle Tracking ID
- 1348828088493802896
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-01279
- Alternative reference
- 123A90-DDL-SAF-LIS-30000
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 2 current | 04 | 2025-10-27 | 123A90-DDL-SAF-LIS-30000 REV.04-1348828089116692436df.pdf PDF · 5.4 MB 123A90-DDL-SAF-LIS-30000 REV.04-1348828089085260135df.pdf PDF · 5.4 MB · copy | 127 pages, 205 passages |
| Version 1 | 03 | 2025-04-22 | 123A90-DDL-SAF-LIS-30000 REV.03-1348828089070523962df.pdf PDF · 4.9 MB | 127 pages, 205 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2025-10-27 | 04 | Approved for Construction | Version 2 | current |
| 2025-06-19 | 04 | Issued for Construction | Version 2 | |
| 2025-04-22 | 03 | Issued for Construction | Version 1 |