ROSMA-INN-BPH-PRD-00158
Rev 01Approved for Construction1724000936-COM-PRO-00024-PRE-COMMISSIONING -COMMISSIONING PROCEDURES - For Sea Water Lift Progressive Cavity Pumps (P-50001 AB) (PCM)
Zip archive: its contents are not searchable yet; found by its metadata only.
Metadata
- Document number
- ROSMA-INN-BPH-PRD-00158
- Title
- 1724000936-COM-PRO-00024-PRE-COMMISSIONING -COMMISSIONING PROCEDURES - For Sea Water Lift Progressive Cavity Pumps (P-50001 AB) (PCM)
- Revision
- 01
- Status
- Approved for Construction
- Type
- Procedure
- Discipline
- Innovations package mgt
- Project phase
- Design
- Date modified
- 2025-10-27
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Documentation
- Oracle Tracking ID
- 1348828088493789199
- Created by
- ROSETTI
- Review status
- None
- File type
- zip
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-01401
- Alternative reference
- 1724000936-COM-PRO-00024
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 1 current | 01 | 2025-10-27 | 1724000936-COM-PRO-00024 REV.01-1348828089116692448df.zip ZIP · 1.2 MB 1724000936-COM-PRO-00024 REV.01-1348828089070524068df.zip ZIP · 1.2 MB · copy | Zip archive: its contents are not searchable yet; found by its metadata only. |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2025-10-27 | 01 | Approved for Construction | Version 1 | current |
| 2025-04-22 | 01 | Code 3 - fail | Version 1 |