ROSMA-INN-BPH-RPT-00016
Rev 04Approved for Construction123A90-DDL-PR-RE-80032 - Insulation and Winterisation Philosophy
Metadata
- Document number
- ROSMA-INN-BPH-RPT-00016
- Title
- 123A90-DDL-PR-RE-80032 - Insulation and Winterisation Philosophy
- Revision
- 04
- Status
- Approved for Construction
- Type
- Report
- Discipline
- Innovations package mgt
- Project phase
- Design
- Date modified
- 2026-01-19
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Documentation
- Oracle Tracking ID
- 1348828088488346429
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-00247
- Alternative reference
- 123A90-DDL-PR-RE-80032
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 3 current | 04 | 2026-01-19 | 123A90-DDL-PR-RE-80032 REV.04-1348828089150735905df.pdf PDF · 448.8 KB | 11 pages, 15 passages |
| Version 2 | 03 | 2025-10-27 | 123A90-DDL-PR-RE-80032_Rev03-1348828089116692528df.pdf PDF · 250.0 KB 123A90-DDL-PR-RE-80032_Rev03-1348828089085259938df.pdf PDF · 250.0 KB · copy | 11 pages, 15 passages |
| Version 1 | 02 | 2025-04-22 | 123A90-DDL-PR-RE-80032_Rev.02-1348828089070524580df.pdf PDF · 232.1 KB | 11 pages, 15 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2026-01-19 | 04 | Approved for Construction | Version 3 | current |
| 2025-10-27 | 03 | Code 2 - comments | Version 2 | |
| 2025-06-19 | 03 | Issued for Construction | Version 2 | |
| 2025-04-22 | 02 | Issued for Construction | Version 1 |