ROSMA-INN-BPH-RPT-00013
Rev 01Approved for Construction

123A90-DDL-EL-RE-20151 - Cable Sizing Calculation Report (including end of line minimum fault current clearance verification)

Open PDFDownload PDF

Metadata

Document number
ROSMA-INN-BPH-RPT-00013
Title
123A90-DDL-EL-RE-20151 - Cable Sizing Calculation Report (including end of line minimum fault current clearance verification)
Revision
01
Status
Approved for Construction
Type
Report
Discipline
Innovations package mgt
Project phase
Design
Date modified
2025-04-22
WBS scope 1
Baseload Power Hub
WBS scope 2
Baseload power hub overall
Keywords
Documentation
Oracle Tracking ID
1348828088488257342
Created by
ROSETTI
Review status
None
File type
pdf
Contract deliverable
✗
As-built required
✗
Confidential
✗
Scale
0:0
Relationship
CWHKN-INN-BPH-CRS-00288
Alternative reference
123A90-DDL-EL-RE-20151

Versions

VersionRevisionDateFilesText
Version 1 current012025-04-22123A90-DDL-EL-RE-20151 Rev.01-1348828089070484682df.pdf PDF · 1.2 MB103 pages, 143 passages

Status history (Oracle)

DateRevisionStatusFileNote
2025-04-2201Approved for ConstructionVersion 1current