ROSMA-INN-BPH-RPT-00175
Rev 01Approved for Construction1724000740-COM-LIS-00018-SPIR (COMMISSIONING 2-YEARs OPERATION)-CONTROL VALVES (AST)
Metadata
- Document number
- ROSMA-INN-BPH-RPT-00175
- Title
- 1724000740-COM-LIS-00018-SPIR (COMMISSIONING 2-YEARs OPERATION)-CONTROL VALVES (AST)
- Revision
- 01
- Status
- Approved for Construction
- Type
- Report
- Discipline
- Innovations package mgt
- Project phase
- Design
- Date modified
- 2025-04-22
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Documentation
- Oracle Tracking ID
- 1348828088492701979
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-01042
- Alternative reference
- 1724000740-COM-LIS-00018
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 1 current | 01 | 2025-04-22 | 1724000740-COM-LIS-00018 Rev.01-1348828089070492141df.pdf PDF · 355.8 KB | 5 pages, 8 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2025-04-22 | 01 | Approved for Construction | Version 1 | current |