ROSMA-INN-BPH-PRD-00121
Rev 03Approved for Construction1724000437-MAT-PRO-00021-PAINTING PROCEDURE - NITROGEN GENERATION PACKAGE (COES)
Zip archive: its contents are not searchable yet; found by its metadata only.
Metadata
- Document number
- ROSMA-INN-BPH-PRD-00121
- Title
- 1724000437-MAT-PRO-00021-PAINTING PROCEDURE - NITROGEN GENERATION PACKAGE (COES)
- Revision
- 03
- Status
- Approved for Construction
- Type
- Procedure
- Discipline
- Innovations package mgt
- Project phase
- Design
- Date modified
- 2025-04-22
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Documentation
- Oracle Tracking ID
- 1348828088492576270
- Created by
- ROSETTI
- Review status
- None
- File type
- zip
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-00995
- Alternative reference
- 1724000437-MAT-PRO-00021
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 1 current | 03 | 2025-04-22 | 1724000437-MAT-PRO-00021 REV.03-1348828089070524430df.zip ZIP · 3.0 MB | Zip archive: its contents are not searchable yet; found by its metadata only. |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2025-04-22 | 03 | Approved for Construction | Version 1 | current |