ROSMA-INN-BPH-RPT-00144
Rev 05Code 1 - no comments1724000448-IN-LIS-00021-INSTRUMENT LIST WITH SET POINTS-CONTROL-ALARM-SHUTDOWN- WATER TREATMENT PACKAGE (PSC)
Metadata
- Document number
- ROSMA-INN-BPH-RPT-00144
- Title
- 1724000448-IN-LIS-00021-INSTRUMENT LIST WITH SET POINTS-CONTROL-ALARM-SHUTDOWN- WATER TREATMENT PACKAGE (PSC)
- Revision
- 05
- Status
- Code 1 - no comments
- Type
- Report
- Discipline
- Innovations package mgt
- Project phase
- Design
- Date modified
- 2025-10-27
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Documentation
- Oracle Tracking ID
- 1348828088492314041
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-00977
- Alternative reference
- 1724000448-IN-LIS-00021
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 2 current | 05 | 2025-10-27 | 1724000448-IN-LIS-00021 REV.05-1348828089116692289df.pdf PDF · 226.5 KB | 8 pages, 24 passages |
| Version 1 | 04 | 2025-04-22 | 1724000448-IN-LIS-00021 REV.04-1348828089070524543df.pdf PDF · 394.1 KB | 8 pages, 23 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2025-10-27 | 05 | Code 1 - no comments | Version 2 | current |
| 2025-04-22 | 04 | Code 2 - comments | Version 1 |