ROSMA-INN-BPH-DWG-00034
Rev 05As-Built123A90-DDL-PR-PID-80012 - BLPH PIPING AND INSTRUMENTATION DIAGRAM FUEL CELL PACKAGE
Metadata
- Document number
- ROSMA-INN-BPH-DWG-00034
- Title
- 123A90-DDL-PR-PID-80012 - BLPH PIPING AND INSTRUMENTATION DIAGRAM FUEL CELL PACKAGE
- Revision
- 05
- Status
- As-Built
- Type
- Drawing
- Discipline
- Innovations package mgt
- Project phase
- As Built
- Date modified
- 2025-11-14
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Documentation
- Oracle Tracking ID
- 1348828088488205055
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-00212
- Alternative reference
- 123A90-DDL-PR-PID-80012
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 2 current | 05 | 2025-11-14 | 123A90-DDL-PR-PID-80012 Rev.05-1348828089122444278df.pdf PDF · 559.7 KB 123A90-DDL-PR-PID-80012 Rev.05-1348828089116692202df.pdf PDF · 559.7 KB · copy | 1 pages, 2 passages |
| Version 1 | 04 | 2025-06-19 | 123A90-DDL-PR-PID-80012_rev04-1348828089085260020df.pdf PDF · 200.9 KB 123A90-DDL-PR-PID-80012_rev04-1348828089070524277df.pdf PDF · 200.9 KB · copy | 1 pages, 2 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2025-11-14 | 05 | As-Built | Version 2 | current |
| 2025-10-27 | 05 | Issued As-Built | Version 2 | |
| 2025-06-19 | 04 | Approved for Construction | Version 1 | |
| 2025-04-22 | 04 | Issued for Construction | Version 1 |