ROSMA-INN-BPH-PRD-00101
Rev 03Approved for Construction1724000372-QC-PRO-00016-DC UPS - FACTORY ACCEPTANCE TEST PROCEDURE-AC DC UPS (3W POWER)
Metadata
- Document number
- ROSMA-INN-BPH-PRD-00101
- Title
- 1724000372-QC-PRO-00016-DC UPS - FACTORY ACCEPTANCE TEST PROCEDURE-AC DC UPS (3W POWER)
- Revision
- 03
- Status
- Approved for Construction
- Type
- Procedure
- Discipline
- Innovations package mgt
- Project phase
- Design
- Date modified
- 2025-04-22
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Documentation
- Oracle Tracking ID
- 1348828088492021260
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-00900
- Alternative reference
- 1724000372-QC-PRO-00016
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 1 current | 03 | 2025-04-22 | 1724000372-QC-PRO-00016 REV.03-1348828089070492121df.pdf PDF · 727.3 KB | 14 pages, 14 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2025-04-22 | 03 | Approved for Construction | Version 1 | current |