ROSMA-INN-BPH-RPT-00126
Rev 01Approved for Construction123A90-DDL-EL-RE-20174 - Electrical System Study Report - Vital Supply Recovery
Metadata
- Document number
- ROSMA-INN-BPH-RPT-00126
- Title
- 123A90-DDL-EL-RE-20174 - Electrical System Study Report - Vital Supply Recovery
- Revision
- 01
- Status
- Approved for Construction
- Type
- Report
- Discipline
- Innovations package mgt
- Project phase
- Design
- Date modified
- 2025-04-22
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Design
- Oracle Tracking ID
- 1348828088491963128
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-BMG-BPH-CRS-00006
- Alternative reference
- 123A90-DDL-EL-RE-20174
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 1 current | 01 | 2025-04-22 | 123A90-DDL-EL-RE-20174 Rev.01-1348828089070491783df.pdf PDF · 255.8 KB | 13 pages, 17 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2025-04-22 | 01 | Approved for Construction | Version 1 | current |