ROSMA-INN-BPH-RPT-00097
Rev 03Approved for Construction1724000163-WEL-LIS-00011-WELDING PROCEDURE SPECIFICATION (WPS) AND QUALIFICATIONS (PQR) RECORDS, WELDING OPERATORS LIST and WELDER QUALIFICATIONS RECORDS (WPQ) and WELDING MAP (C.A.M.P.I)
Metadata
- Document number
- ROSMA-INN-BPH-RPT-00097
- Title
- 1724000163-WEL-LIS-00011-WELDING PROCEDURE SPECIFICATION (WPS) AND QUALIFICATIONS (PQR) RECORDS, WELDING OPERATORS LIST and WELDER QUALIFICATIONS RECORDS (WPQ) and WELDING MAP (C.A.M.P.I)
- Revision
- 03
- Status
- Approved for Construction
- Type
- Report
- Discipline
- Innovations package mgt
- Project phase
- Design
- Date modified
- 2025-04-22
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Documentation
- Oracle Tracking ID
- 1348828088491639018
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-00761
- Alternative reference
- 1724000163-WEL-LIS-00011
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 1 current | 03 | 2025-04-22 | 1724000163-WEL-LIS-00011 REV.03-1348828089070523972df.pdf PDF · 30.5 MB | 132 pages, 240 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2025-04-22 | 03 | Approved for Construction | Version 1 | current |