ROSMA-INN-BPH-PRD-00073
Rev 05Approved for Construction1723001595-WEL-PRO-00024-Welding Procedure- 66KV SWITCHGEARS (GIS) (HYOSUNG)
Metadata
- Document number
- ROSMA-INN-BPH-PRD-00073
- Title
- 1723001595-WEL-PRO-00024-Welding Procedure- 66KV SWITCHGEARS (GIS) (HYOSUNG)
- Revision
- 05
- Status
- Approved for Construction
- Type
- Procedure
- Discipline
- Innovations package mgt
- Project phase
- Design
- Date modified
- 2025-04-22
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Documentation
- Oracle Tracking ID
- 1348828088491557577
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-00754
- Alternative reference
- 1723001595-WEL-PRO-00024
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 1 current | 05 | 2025-04-22 | 1723001595-WEL-PRO-00024 REV.05-1348828089070491474df.pdf PDF · 9.1 MB | 88 pages, 91 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2025-04-22 | 05 | Approved for Construction | Version 1 | current |