ROSMA-INN-BPH-PRD-00063
Rev 01Approved for Construction1724000344-QC-PRO-00012 - TRACEABILITY PROCEDURE - TRANSITION PIECE FLANGE (FIHI)
Metadata
- Document number
- ROSMA-INN-BPH-PRD-00063
- Title
- 1724000344-QC-PRO-00012 - TRACEABILITY PROCEDURE - TRANSITION PIECE FLANGE (FIHI)
- Revision
- 01
- Status
- Approved for Construction
- Type
- Procedure
- Discipline
- Innovations package mgt
- Project phase
- Design
- Date modified
- 2025-10-27
- WBS scope 1
- Baseload Power Hub
- WBS scope 2
- Baseload power hub overall
- Keywords
- Documentation
- Oracle Tracking ID
- 1348828088491264221
- Created by
- ROSETTI
- Review status
- None
- File type
- Contract deliverable
- ✗
- As-built required
- ✗
- Confidential
- ✗
- Scale
- 0:0
- Relationship
- CWHKN-INN-BPH-CRS-00662
- Alternative reference
- 1724000344-QC-PRO-00012
Versions
| Version | Revision | Date | Files | Text |
|---|---|---|---|---|
| Version 2 current | 01 | 2025-10-27 | 1724000344-QC-PRO-00012 REV.01-1348828089116692186df.pdf PDF · 623.5 KB | 10 pages, 14 passages |
| Version 1 | 00 | 2025-04-22 | 1724000344-QC-PRO-00012 Rev.00-1348828089070483994df.pdf PDF · 563.1 KB | 8 pages, 12 passages |
Status history (Oracle)
| Date | Revision | Status | File | Note |
|---|---|---|---|---|
| 2025-10-27 | 01 | Approved for Construction | Version 2 | current |
| 2025-04-22 | 00 | Code 2 - comments | Version 1 |